The Royal Parks has received approval to carry out restoration and improvement works on Beverley Brook, a river running through the eastern section of Richmond Park in South West London, along with the surrounding land. Richmond Council granted a certificate of lawful development for the project, which aims to improve the stream's flow and climate resilience while restoring habitats for wildlife. The works can now proceed without the need for planning permission.
Details of the Restoration Works
The planned works involve reshaping the slopes of the riverbank and creating scrapes, swales, and berms in the land to manage water runoff and boost wildlife. A deer gate and fencing will be installed to protect the area, and woody features will be added to enhance the habitat. These measures are designed to promote a self-sustaining and dynamic river system, according to planning documents.
The documents state: "The design promotes the development of a self-sustaining and dynamic river system, where installed features are expected to evolve and be reshaped by natural processes over time. Accordingly, some adjustment and movement within the channel should be anticipated and is considered an integral part of the scheme's success."
Balancing Act During Drought
The Royal Parks faces a challenging balancing act in maintaining ecosystems like Richmond Park during the ongoing drought. Restrictions are currently in place due to an amber heat health warning, including the closure of the slides at Petersham playground. A general ban on barbecues remains in effect to prevent wildfires, as the park works to protect its natural environment.
Impact and Next Steps
The restoration of Beverley Brook is expected to enhance the resilience of the river and its surrounding habitats, benefiting wildlife and improving the park's ability to cope with climate change impacts. With the certificate granted, The Royal Parks can now proceed with the works, which will be carried out in the eastern section of the park and the adjacent land.



